Attention: Eastside STP Riders

A note to plan accordingly. No point in getting stuck waiting for a barge to cross as you try to get the start line. From Washington DOT:

Attention cyclists and Seattle to Portland participants:

  • The I-90 bike and pedestrian path on the floating bridge will close after 9 p.m. Friday, July 10 to all bicycle and pedestrian traffic and scheduled to reopen by 6 a.m. Saturday, July 11, to allow crews to set the expansion joint. Make backup plans for crossing Lake Washington.

  • The SR 520 bridge will be temporarily closed to traffic sometime between 3-6 a.m. Saturday, July 11, to allow a construction barge to pass. The closure will last at least 30 minutes. Those driving to the Seattle-To-Portland start line Saturday morning should allow extra time for this closure or take I-90 to UW.



0 Comments

Login to leave a comment




Built Tout

Built Tout

kickstand_tout

Clip-n-Seal Ads

Advertise here

About this Entry

This page contains a single entry by andrew_f_martin published on July 10, 2009 11:42 AM.

Seattle to Portland 09 was the previous entry in this blog.

30 Years of STP is the next entry in this blog.

You can find recent content on the main index.

Ads


About Bike Hugger

Happy Cog Hosting